top of page

INFRASTRUCTURE AND LOCATION INTELLIGENCE

Home: Welcome

ABOUT

Spatial Planning Innovations, LLC is a civil engineering firm based in Greenville, South Carolina. Our objective is to provide cost-effective solutions to meet your project goals. Each project is seen as a unique opportunity to apply state-of-the-industry solutions with the purpose of minimizing our client's capital expenditures.

From complex, large-scale, greenfield site developments to small-scale redevelopments and everything in between, we've got the experience to meet your objectives. With nearly 20 years of experience in the civil site development industry, we've provided civil engineering services across not only the Southeastern U.S., but across the nation. With this broad range of exposure, we understand how to engage and build beneficial relationships with jurisdictional authorities in a wide variety of environments.

Home: About

SERVICES

We’ve gained valuable experience providing our engineering services across a range of sectors. Some of the typical services we provide include Planning, Design, Permitting, and Construction Phase Services, and each project is designed to fit specific client needs. Our work has far-reaching impacts, and we strive for the utmost in professional and quality results.

Home: Services

PLANNING

Planning_edited.png

Due Diligence

Feasibility Studies

Master Planning

Pre-Construction

Preliminary Cost Analysis

Rezoning

Annexation

Variances

Partner Services - Surveying, Geotechnical,

Traffic Impact Analysis, Jurisdictional

Delineation, Environmental Site Assessments

DESIGN

Designedited.png

Site Layout and Paving

Grading and Storm Drainage

Erosion Control

Underground Utilities

Code Required Landscaping

Stormwater Quantity and Quality Management

Site Access and Roadway Improvements

Lift Stations and Force Mains

Underground Fire Protection

Railroad Turnouts and Industrial Track

Partner Services - Landscape Architecture,

Retaining Walls, Irrigation Systems

PERMITTING

Permittingedited.png

Zoning/Site Plan

Land Development/Disturbance

Erosion Control/NPDES

Grading and Stormwater

Utility Construction

Department of Transportation Encroachments

FAA Obstruction

State Fire Marshal

Partner Services - Jurisdictional Impacts,

Traffic Signalization Improvements

CONSTRUCTION PHASE SERVICES

Constructionedited.png

Material Takeoffs
Contractor Bid Assistance
Pre-Bid Meetings
Technical Bid Analysis
Pre-Construction Meetings
Construction Observations
NPDES Inspections
Contractor Pay Application Review
Product Submittal/Shop Drawing Review

PROJECT EXPERIENCE

At Spatial Planning Innovations, LLC, we work closely with our clients to meet each opportunity that comes our way. No matter how complex or involved each new project is, we have the versatility and expertise to achieve your goals. Check out a small sample of our project experience below. While these projects have been chosen to demonstrate our experience with complex site development projects, we have provided similar services for commercial, institutional, and residential projects as well.

Home: Projects

CARBON FIBER MANUFACTURING FACILITY

South Carolina

A greenfield industrial site development consisting of approximately 150 acres of site disturbance, 2 million cubic yards of earthwork, relocation of high-voltage overhead power lines, and installation of several thousand linear feet of various pressurized and gravity underground utility systems. Unique opportunities on this project included careful consideration of construction phasing and vast areas of slope stabilization.

FOOD PRODUCTION FACILITY ASRS SYSTEM

Arkansas

Although designed as a high-rise, rack-supported automated storage and retrieval system (ASRS) to minimize the required footprint, this project was located at an operating food production facility and required special attention to construction logistics and existing conditions. Offset of floodplain impacts, relocation of existing underground utility systems, installation of new underground utilities, re-routing existing stormwater drainage patterns, and reconfiguration/addition of truck maneuvering and trailer storage areas highlight the complexity of this project.

BIOMASS PELLET FACILITY

North Carolina

Consisting of several process equipment islands connected by conveyor systems, this project required special attention to site grading, drainage, and paving. Over 15,000 linear feet of new industrial storage track encircle this site which required critical coordination of rail elevations at the main turnout and lead track, as well as at the state highway crossing. Several underground utility systems were required to serve the process, including a lift station and force main system connected to a header at the septic dispersion field.

FLUFF PULP FACILITY EXPANSION

Arkansas

This existing facility included a building expansion in order to house new process equipment which required a new industry track and turnout to bring rail cars into the expansion. The industry track required a new three-sided box culvert to cross an existing jurisdictional stream. Relocation of underground utilities was also required to accommodate the expansion.

FOOD PACKAGING PRODUCTS WAREHOUSE EXPANSION

Texas

Development of this site required undercut and replacement of several feet of near-surface soils to reduce the vertical rise potential associated with fat clays. Underground utility systems were extended to allow for future expansion possibilities. An N-Pentane unloading containment area and associated underground piping, as well as a wastewater metering system highlight a few of the complexities associated with the project.

MAJOR NORTH AMERICAN TIRE MANUFACTURER EARTHMOVER TIRE FACILITY

South Carolina

A greenfield site with over 500,000 square feet under roof for the first phase, this facility required master planning to allow for the infrastructure necessary to support future expansion potential. Several large diameter underground utility systems were required to support future development potential. Unique opportunities associated with this project included a wastewater pretreatment system with oil/water separation, flow measurement, automatic sampling and storage, lift station, and more than a mile of force main required to connect to the municipal sewer line.

IMG_0103_edited.jpg

CONTACT US

Contact us today and find out more about how we can help on your next civil site development project.

(864) 630-7524

  • linkedin

Thanks for submitting!

Home: Contact
bottom of page